Os pongo las novedades de esta temporada que aparecen en la web de Dolomity. Es curioso que no aparezca la nueva silla en Arabba...
NEW AND RENEWED LIFTS AND SLOPES FOR THE WINTER SEASON 2015-2016
Cortina d’Ampezzo
Enlargement of the slope “Canalone Tofana”
Improvement of the snow making system of the area Tofana/Pocol/Socrepes
Full employment of the water basin for the snow making system at Po’ Druscié
Kronplatz
Replacement of the automatic cabin Lift Belvedere with a new automatic cabin lift with 15 seats
(Transportation: p/h 3,300, length: 1,061 m, vertical drop: 268 m). Every cabin is provided with
free Wi-Fi. Investment: 7,000,000 Euro
New slope “Variante Ried” in the last part of existing slope “Ried”. Length: 345 m, vertical
drop: 60 m, average steepness: 13 %, max. steepness: 16 %, sea level start: 1,020 m, sea level
end: 960 m. Classification: blue. Investment: X Euro
Enlargement of the slope Alpen on the hillside of Valdaora, with optimization of the snow making
system. Investment: 2,000,000 Euro
Improvement of the snow making system of the area „Miara“. Investment: 200,000 Euro
New MMM - Messner Mountain Museum at Kronplatz: open from 23 July 2015. Investment:
3,000,000 Euro
Alta Badia
Replacement of the 4-seater chairlift «La Fraina» with an automatic 6-seater chairlift
(Transportation: p/h 2,400, length: 738 m, vertical drop: 210 m). Stima costi: 4,000,000 Euro
New snow making system on the slope 9b (Pralongià – San Cassiano). Investment: 800,000 Euro
Water basin with 60,000 m3 in the area „Braia Fraida“. Investment: 2,500,000 Euro
Val Gardena/Alpe di Siusi
Replacement of the fix 2-seater chairlift “Comici 2” with an automatic 6-seater chairlift and mobile
carpet (Transportation: p/h 2,200). Investment: 3,500,000 Euro
New slope “Paprika”, as a variant of the existing slope Seef, from Piz Sella to Plan de Gralba.
Length: 1,050 m, vertical drop: 294 m, average steepness: 29.17 %, max. steepness: 35.46 %,
sea level start: 2,239 m, sea level end: 1,945 m. Classification: black. Investment: 500,000 Euro
Improvement of the snow making system at the chair lift “Fungeia”, Sella Ronda clockwise.
Investment: 180,000 Euro
Val di Fassa/Carezza
New cable car Funifor type “Alba – Col dei Rossi” with cabins for 100 persons (Transportation: p/h
1,200, length: 2,262 m, vertical drop: 883 m) that connects Alba di Canazei to the skiing area
Belvedere. Investment: 18,000,000 Euro
Low rope lift at the new “Kinderland” of Malga Frommer at Carezza (Transportation: p/h 650,
length: 107.52 m, vertical drop: 17.30 m). Investment: 300,000 Euro for the entire Kinderland.
Arabba/Marmolada
Area Arabba
Snow making system on the slope “Le Pale”. Investment: 300,000 Euro
Integration of the snow making system on the slope “Incisa”. Investment: 250,000 Euro
Improvement of the snow making system on the slope “Cherz 2”. Investment: 165,000 Euro
Dismantling of the 2-seater chair lift “Portados”
Area Marmolada
New museum of the World War 1 at the intermediate station “Punta Serauta” of the cable car to
Marmolada summit. It’s situated at an altitude of 3,000 m ad it is the highest museum in Europe.
It show original finds from the World War 1 and especially from the “Ice City” of the Marmolada
on 300 m2 expo surface.
Sextner Dolomiten
New bridge for pedestrian that links the railway station of Versciaco and the service building
“Punka” right near the lift station of the gondola to Monte Elmo. Investment: 2,000,000 Euro
Val di Fiemme/Obereggen
Improvement and enlargement of the snow making system in the whole ski area Obereggen, with
upgrade to 200 snow machines. Investment: 1,000,000 Euro
Enlargement of the snow park Obereggen with the installation of new acrobatic elements
Enlargement of the Wi-Fi network in the whole skiing area
S. Martino di Castrozza/Passo Rolle
Area San Martino
Adaption of the slope „Rododendro“ with improvement of the snow making system
Enlargement of the water basin for the snow making system to a total 45,000 m3 of capacity, at
the lifts of Tognola area. Investment: 3,000,000 Euro
New mobile carpet from the center of San Martino di Castrozza (parking ex cinema) to the bottom
station of the cabin lift Col Verde
Area Passo Rolle
The chair lift Cimon is now allowed to transport also pedestrians, who want to use the sledge
track and the snow shoeing track
Valle Isarco
Area Plose: construction of the new slope “Erler” as a variant to the slope Schönboden.
Length: 480 m, vertical drop: 120 m, average steepness: 16 %, max. steepness: 25 %, sea level
at start: 2,220 m, sea level at the end: 2,100 m. Classification: blue. Investment: 200,000 Euro
Improvements on all systems within the skiing area
Alpe Lusia - San Pellegrino
New automatic 8-seater cabin lift “Falcade-Le Buse“ (Transportation: p/h 2,400, length: 1,890 m,
vertical drop: 685 m) that replaces the old 4-seater chair lift. Investment: 14,000,000 Euro
Civetta
Improvement of the snow making system between “Col dei Baldi” and Alleghe on the slopes
“Coldai” and “Rientro Alleghe”. Investment: 2,000,000 Euro
New Kinderland at “Piani di Pezzé” with a total area surface of 2,000 m2, building for the kids,
playground, mobile carpet and ski school area